Installation of HVAC system

The next important stage of creating HVAC system is its installation. That process is the complex of installation works of equipment: ventilation units, fans, calorifiers, filters, air consumption control devices. Following all the requirements and conditions mentioned in the project, specialists carry out the entire process. Skilled and experienced specialists, installation engineers, fitters are included in installation work. Each worker clearly knows his job and ensures the accurate execution of the whole work.

After the installation works, the entire system is tested and operated.

Production of HVAC system elements

During the creation of HVAC system used elements should be high-quality and comply with the presented requirements.

For more than 24 years MKO OJSC has been engaged in the production of numerous elements that are an important part of HVAC system, such as air duct, their additional components, sound insulators of various sizes, throttle valves, flexible inserts, devices for air distribution networks, the filters. In case of orders not standard elements can also be created.

Using only high-quality raw material and technic the main goal of our company is to create production, which can provide efficient work of the whole HVAC system.

Sherep restaurant

The HVAC system of “Sherep” restaurant, operating since 2017, was also created by our company. Taking into account the restaurant’s features and design ideas, a system was created that corresponds to expectations and wishes of our client.

Degusto

Inner engineering projection, preparation and installation of HVAC system of “Degusto” was carried out by us in 2020

Angus burgery and more

Another project which was put together by us in 2020-2021. It was creation of HVAC system of “Burgery Angus & More” fast food centre.

The HVAC system of this center is renowed not only for its high quality and efficiency, but also for its appearance, being an important part of interesting design solution.

Yerevan park

In 2020 the creation of Yerevan park’s HVAC system was completed.
Being an entertainment center intended more for children, the correct operation of the HVAC systems required even more detailed engineering analysis.
The work was also not simple because the air ducts had to be placed in rather high places.
Our team demonstrated high professionalism in this work and created unique system of HVAC.

Erebuni Mall

The entire process of creating the HVAC system of the Erebuni Mall shopping center, occupying a total area of 44,000 square meters, was carried out by our company. Taking into account the purpose of the center, we have created a HVAC system that will be able to provide all the conditions for complete comfort

O2 Gardens

In June 2022, the opening ceremony of the “O2 Gardens” Botanical Garden took place. It is located in Silikyan district in Yerevan. The internal engineering design, preparation and installation of the HVAC systems of this wonderful project were and continue to be carried out by us. The work is still going on in certain areas, but it has almost reached its conclusion.

Ventilators

“MKO” is specialized in producing ventilators. For this production there are used advanced equipments, where work skilled specialists and utilize the latest technologies. The need and requirement of ventilators increase due to the growth of the annual construction works: cafes, restaurants, shops, offices, hospitals, swimming pools and etc.

We offer efficient and high-quality product of ventilators. We produce ventilators of air filtration  and in addition to it galvanized components, noise reduction with various thickness, drossel-valves, flexible tabs, adapters for air distributer sets, filters and also non-standard spontaneous parts.

The production of ventilators and its set production correspond to the international standards and  ГОСТ  standards.

We produce all main types of ventilators:

  • Plastic ventilators
  • Galvanized ventilators
  • Rectangular ventilators
  • Spiral ventilators

The plastic ventilators are advised to be installed in wet and aggressive environments, such as in chemical production, in pharmaceutical and in food industry productions. The plastic is stable in water, in acid and in normal environments , besides it is very light.

The galvanized ventilators will serve for decades and is the longest lasting type. For its security and  assurance  it has been modern in Soviet Union period.

The rectangular ventilators are used in places where can be space limitation. For example: under the suspended ceilings. It is utilized more because the rectangular shape promote to the appropriate installation of the vent-hole.

We are very attentive to the product of ventilation boxes because they are remarkable goods and very often consider to be the integral part for home-decorations or for architectural solutions.

Be sure to trust the ventilators of our company.

Design of HVAC system

The first stage of creating HVAC system is their design process. This stage is the most important as the efficiency of further works depend on it. At first a meeting takes place with partner, during which many essential issues are discussed. After the final agreement, the actual design process begins. Our experienced and high-quality engineers create a complete design, taking into account a number of important indicators, including the size of the space, the goals of the use of the space, the number of people in each room, climatic features, etc. The project specifies type, size, shape and location of each device, equipment, vent, duct.

When the project is ready, a discussion takes place during which the engineer presents the plan he/she has made.

Projection process is followed by further works.